Slope Stabilisation

Work was carried out to remediate damage caused by a landslip at Beechmont Road, Lower Beechmont. Nucon supplied products to Main Roads Specifications, including Main Roads specification of 32mpa spray with novamesh fibres on certain selected areas of the slipface. 

Access to site was difficult due to the steep nature of the land, however Nucrush Quarries provided 80/100mm rock to stablise the track for all vehicle access,